Reviews from William Armbruster (1)

  • Bridge comment on Bayonne Bridge

    Comment by: William Armbruster on Oct 6, 2025
    Vessel Type: Sail
    LOA: 30'

    The Bayonne bridge was raised and it's now 215 feet clearance above the water.

    • WG Editor Comment:

      We've verified this information. A project completed in 2019 raised the roadway by about 64 feet (from 151 ft to 215 ft) within the existing arch span.

    View location on the Waterway Guide Explorer